McLoughlin Wastewater Treatment Plant Planned Maintenance

Jul 17, 2024

Possible intermittent odors near McLoughlin Wastewater Treatment Plant

The carbon that captures odours at various points in the system is nearing the end of useful life expectancy and is currently being replaced. When carbon is nearing the end of its useful life, odours may increase. All carbon in the system will be replaced on or before August 2. Please note, that the replacement of the carbon in the system may generate intermittent odours.

Current weather conditions are favourable to complete the above scheduled maintenance. Should weather conditions change substantially, maintenance will be re-rescheduled.

Any questions about the maintenance work or odour concerns can be directed to wastewater@crd.bc.ca