About the System
The Cedar Lane Water System is located on the north east side of Salt Spring Island and provides drinking water to approximately 37 service connections. The CRD Integrated Water Services is responsible for the overall operation of the water system. The design and construction of water system facilities are overseen by the CRD Infrastructure Engineering and Operations Division. The day-to-day operations and maintenance are conducted by a contractor. The quality of drinking water provided to customers in the Cedar Lane Water System is overseen by the CRD Water Quality Division.
System Information
Water Restrictions
Current Conservation Stage: No Restrictions
Every drop counts! Visit our resource page for more ways to use water wisely.
Water Conservation Bylaw 4492
The Electoral Area Water Conservation Bylaw (4492) is in effect May 1 to September 30, unless otherwise authorized by the General Manager of Integrated Water Services.
Lawn Watering Schedule:
- Stage 1 – Watering only permitted once per week between the hours of 4-10am or 7-10pm.
- Stage 2 – Watering only permitted once every two weeks between the hours of 4-10am or 7-10pm.
- Stage 3 – Watering not permitted.
Source Water
The Cedar Lane Water System obtains its drinking water from two deep wells: Well #1 and Well #5. Well #5 is the primary source of water for the water system.
Water Treatment Process
The water treatment process consists of coarse filtration, Ultra Violet Light disinfection and chlorine (liquid sodium hypochlorite) disinfection.
Distribution System
Treated water is pumped to the Cedar lane tank and distributed to customers through a 1,500 metre network of 150mm (6”), 100mm (4“) and 50mm (2”) water mains. Service connections are provided to the property line with curb stops and individual household meters. Service from the property line to the dwelling is the homeowners’ responsibility. The distribution system also contains hydrants and standpipes.